AEV 9.09% 1.0¢ avenira limited

the horse's mouth, page-7

  1. 3,540 Posts.
    lightbulb Created with Sketch. 2
    "why cant the beneficiation (when it is actually required in 6-8 years or more) be performed somewhere else where water is available ie TC or darwin?"

    I'd imagine greater volumes of material would have to be moved to the benefication site when compared to the volume of the final product, would depend on the economics at the time.
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
-0.001(9.09%)
Mkt cap ! $27.04M
Open High Low Value Volume
1.1¢ 1.1¢ 1.0¢ $2.927K 284.2K

Buyers (Bids)

No. Vol. Price($)
3 1722301 1.0¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 1100272 4
View Market Depth
Last trade - 16.10pm 18/11/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.