Gocerler-5 Well Flows at 10.4MMcfd
21/2/03 7:34:00 PM
At 2.30 am WST on Friday, 21 February 2003, the Gocerler-5 well was
perforated and in a series of tests flowed at a stabilised rate of
10.4 mmcfd through a half inch surface choke at a surface flowing
pressure 1640 psi.
The well has been shut in awaiting tie-in to the central gas
processing facility.
This is a very pleasing result and proves continuity of reservoir and
reservoir quality in the northeastern sector of the field.
Joint Venture approves drilling of Adatepe-1
Yesterday, the Thrace JV approved the drilling of the Adatepe
prospect, located 6 kilometres east-southeast of the Gocerler
Gasfield.
The Adatepe prospect is an anticlinal structure with seismic
amplitude anomalies at 5 stratigraphic levels. The prospect is well
definedwith high quality 3D seismic.
The Adatepe-1 well will be drilled with the rig just released from
the Gocerler-5 well. Drilling is anticipated to start towards the
end of March 2003.
The Gocerler Gasfield is operated by Amity and owned by Amity (50%)
and Turkiye Petrolleri AO (50%).
For further information and updates, please refer to Amity's website
at www.amityoil.com.au.
A Barton
CHAIRMAN
- Forums
- ASX - By Stock
- AYO
- alert : moving on.......!
AYO
unknown
alert : moving on.......!, page-5
Featured News
Add AYO (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O'Donovan, Executive Director
Gerard O'Donovan
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online