IP24 flow rate is the highest rate of oil and gas produced in a day. It means daily production rate is increasing. Lets not rush and BRK management has advised that flow rate has exceeded their base estimated rate (which was 1300 BOEPD) and increasing. We want higher flow rate, but not too soon as flow rate starts declining after IP24 rate.
It's upto the mother nature but may be by the end of this week?
- Forums
- ASX - By Stock
- The " ill-timed and unnecessary " Rangers CR
IP24 flow rate is the highest rate of oil and gas produced in a...
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BRK (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $45.34M |
Open | High | Low | Value | Volume |
1.0¢ | 1.0¢ | 1.0¢ | $57.01K | 5.733M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
46 | 28289043 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 13437973 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
48 | 28550043 | 0.009 |
27 | 17860321 | 0.008 |
9 | 4326571 | 0.007 |
6 | 2421677 | 0.006 |
7 | 2758000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 13437973 | 15 |
0.011 | 50598658 | 49 |
0.012 | 11254609 | 16 |
0.013 | 16597673 | 16 |
0.014 | 11833750 | 13 |
Last trade - 12.09pm 04/10/2024 (20 minute delay) ? |
Featured News
BRK (ASX) Chart |