Lol.
Another pointless fake news deflection thread from the hc nuclear shill. From channel whack job no less.
Meanwhile the nuclear shill still refuses to post the details of the Dud's nuclear policy .
1. How much will nuclear cost ?
2. How long will it take to build ?
3. Where will they be built ? The grid connections for all the 7 coal sites have already been repurposed for renewable energy and storage . There is no capacity left. lf the Dud wanted to put nuclear at those sites he would have to build a whole new set of transmission infrastructure .
4. Where's the cooling water coming from ? All the cooling water currently assigned to coal is required for mine repair and restoration . Out to 2060 .
5. How can baseload nuclear be feasible in 2040 when mature established baseload coal is going broke in 2024 ?
6. Where would the nuclear waste go ? Kimba in South Australia has rejected the dump. lndigenous people all over the country have rejected it .
7. How long will it take to build a nuclear support industry ?
8. How much will it cost to set up a nuclear support industry ?
9. How long will it take to set up the regulatory environment. Experts are saying it will take 8 years .
10. Under the Dud's plan nuclear will only provide 10% of the grid's power . Where's the rest coming from ?
11. Why are all the 20 nuclear countries the Dud refers to all spending much more money on renewables than they are on nuclear ?
12. Why is Ontario building large baseload energy storage to support nuclear ?
13. Why does the Dud keep missing his nuclear announcement deadlines ?
- Forums
- Political Debate
- The lies are mounting by the Albanese government
The lies are mounting by the Albanese government, page-2
-
- There are more pages in this discussion • 83 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Michael Thurn, CEO & MD
Michael Thurn
CEO & MD
SPONSORED BY The Market Online