Correct. The drill rig will spit out a sample every 2.5m (which is the depth they cut the pit floor down to) on usually a 10m deep blast hole. These are spaced out on a 5m x 5m grid giving them more data than an rc drill with greater spacing as you said.
- Forums
- ASX - By Stock
- the mentalist
Correct. The drill rig will spit out a sample every 2.5m (which...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TBA (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online