@calmbeforestorm
1.5 to 2mtpa you'd think would be easily doable as the updated circuit (extra crusher, ball mill, longer residence times in leach tanks) will slow down plant throughput.
Grade is king.
They can literally throw 750ktpa worth of road base and still have a head grade sitting at 3gt if they can feed the rest of the mill with 750ktpa NN 6gt ore).
Speaking of road base, we do still have over 2 million tons of low grade (0.3gt-0.5gt) ready for milling.
- Forums
- ASX - By Stock
- SPR
- The Mill
The Mill, page-22
Featured News
Add SPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.32 |
Change
0.075(6.05%) |
Mkt cap ! $1.463B |
Open | High | Low | Value | Volume |
$1.32 | $1.36 | $1.30 | $9.643M | 7.293M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 38428 | $1.32 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.33 | 21200 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 38428 | 1.315 |
4 | 62500 | 1.310 |
2 | 23000 | 1.305 |
11 | 178417 | 1.300 |
1 | 7000 | 1.295 |
Price($) | Vol. | No. |
---|---|---|
1.330 | 2000 | 1 |
1.335 | 51000 | 1 |
1.340 | 10000 | 1 |
1.345 | 14555 | 2 |
1.350 | 5000 | 1 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
SPR (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online