@calmbeforestorm
1.5 to 2mtpa you'd think would be easily doable as the updated circuit (extra crusher, ball mill, longer residence times in leach tanks) will slow down plant throughput.
Grade is king.
They can literally throw 750ktpa worth of road base and still have a head grade sitting at 3gt if they can feed the rest of the mill with 750ktpa NN 6gt ore).
Speaking of road base, we do still have over 2 million tons of low grade (0.3gt-0.5gt) ready for milling.
- Forums
- ASX - By Stock
- SPR
- The Mill
The Mill, page-22
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.29 |
Change
0.035(2.80%) |
Mkt cap ! $1.429B |
Open | High | Low | Value | Volume |
$1.26 | $1.31 | $1.25 | $8.109M | 6.342M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 29952 | $1.29 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.29 | 40389 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 29952 | 1.285 |
1 | 8000 | 1.270 |
1 | 23000 | 1.265 |
9 | 136533 | 1.250 |
3 | 33500 | 1.245 |
Price($) | Vol. | No. |
---|---|---|
1.290 | 40000 | 1 |
1.295 | 17477 | 2 |
1.300 | 2223 | 1 |
1.305 | 26020 | 3 |
1.310 | 49603 | 2 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
SPR (ASX) Chart |