88E 0.00% 0.2¢ 88 energy limited

the "new" pad..., page-2

  1. 1,910 Posts.
    lightbulb Created with Sketch. 104
    going even further... all that is needed is then if success in ICE4 =the FarWest vertical into HRZ/stacked conventional, a followup horiztonal just to show it flows as needed...

    and then, these production setups with the first batch being 4 or 5 horizontals plus gas injector (eg;ICE5, ICE6, ICE7, ICE8 at least...), can be repeated on new pads along the highway... if of course the sweetspot material is there...

    Hartleys has different $$$per Acres ranges dependent on stage of the project...
    for Pilot testing it has like 7,500 USD/acre and for Production Well drilling it has like 10,000 USD/acre,
    so one can see where this is all leading too...

    not full out production, but enough to create as much value as possible as quick as possible...

    obviously all of this goes back to ICE2...
    ICE2 needs to be successful, otherwise the whole game shifts to the Conventional only... (effectively)...

    and obviously this is the point in time that we are now at, which is probably the most pivotal in the entire project )))

    [if anything in the above is incorrect or u think wrongly interpreted, then feel free to correct it ]
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.86M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $4.994K 1.908M

Buyers (Bids)

No. Vol. Price($)
231 235943290 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 596780288 209
View Market Depth
Last trade - 16.10pm 14/08/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.