88E 25.0% 0.2¢ 88 energy limited

the "new" pad..., page-3

  1. 1,910 Posts.
    lightbulb Created with Sketch. 104
    brief summary of my interpretations;

    If ICE2=success, then;
    ICE3 =horizontal completion of ICE2 in 2018
    ICE4 =vertical into stacked conventional and vertical into HRZ in the FarWest of new tenements in 2018...
    total cap raising needed; about 30 to 37mill AUD...

    If ICE3=success, then;
    Production setup =ICE5, ICE6, ICE7, ICE8 =new pad nearby to Franklins Bluff (or an extension of it) with 4 or 5 horiztonals and gas injector...
    cost up to 120mill... possibility (??) to cover majority with Loan/Debt finance if only 2 horizontals are needed to be able to book RESERVES, which are then used as backing for the Loan/Debt...

    If ICE4=success, then;
    just complete a horizontal through HRZ to prove the range over the broad tenement acreage, and leave the conventional discovery idle for near term...

    If production setup =success, then;
    copy it a few times along the highway, using Debt Finance if possible, or cash inflow from previous production...

    Hartleys in its report has Pilot Testing at 7,500 USD/acre and Production Well Drilling at 10,000 USD/acre... obviously not for entire acreage but for core versus non-core etc...

    ICE2 results are the key... Success in ICE2 means the above could then possibly roll-out...
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
-0.001(25.0%)
Mkt cap ! $43.40M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $46.48K 23.26M

Buyers (Bids)

No. Vol. Price($)
474 1305395133 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 23140122 3
View Market Depth
Last trade - 15.57pm 17/09/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.