Agree with Cosors, this has already been discussed at length on here...but if I will stop your posting on the issue then I'll give my 2 cents
That article is from Feb 2021 and features the head of the Talma Sami group.
The concerns of the Talma Sami were covered in great detail in Talga's environmental plan from May 2021, which was submitted to the Kiruna Municipality (key extracts below) - https://kiruna.se/download/18.5de4fe8117941d898cf3e9e6/1623143575172/MKB_Stenbrottet_2_1_Nunasvaara_samr%C3%A5d.pdf
"Talma has indicated in previous consultations that it considers that both the key area at Nunasvaara and all themigration routes within the area, including the one running just above Niska Norra, are of national interest, even ifSami Parliament has designated the national interest. The County Administrative Board has pointed out in its consultation statement that migration routes, due toreindeer husbandry's need for functional connections within the Sami village's grazing area, are so important that they could be considered of national interest.Talma Sami uses the area mainly for winter grazing, but there may be reindeer in the area throughout the year.At Nunasvaara there is a collection area where the reindeer naturally go to graze and rest for a longer period.period. Just west of Hosiorinta there are grazing areas used during the migration of reindeer herds betweendifferent grazing areas. There is also a reindeer guard cabin just east of Nunasvaara."
"In order to minimise the impact on reindeer herding, a number of protection measures will be implemented. The individualmost important measure is that opencast mining will only take place during the summer months when the reindeer are notin the area to the same extent. Other measures include the location and design of the industrial estateplanned to avoid the Sami National Interest Areas and to minimise the impact, andnoise, light, dust and odour disturbance from the operation is minimised so that the avoidance zone is as small as possibleas possible. Upon termination of mining activities, the area will be restored in consultation with the Talma sameby.Talma will also be compensated for the increased costs of reindeer husbandry resulting from the company's activities."
"In order to minimise the impact on reindeer herding, opencast mining will only take place during the summer monthswhen reindeer are not in the area to the same extent. The location and design of the industrial area hasplanned to avoid the Sami National Interest Areas and to minimise the impact, andthe avoidance zone is as small as possible. The area will be restored after the end of operations in consultationwith the Talma sameby. With the precautionary, protective and compensatory measures plannedthe impact of the company's activities is considered to be small. The planned activities are deemed to be compatible withreindeer husbandry in the area."
Following this, Talga announced in the DFS in July 2021 that they had completed consultation with the Sami groups (see extract below). So it appears the concerns of the Sami have been satisfied with Talga's precautions to limit disruption to reindeer husbandry, as well as the compensation for increased costs.
"Consultation has been completed with the Sami indigenous groups and constraints have been put on the mining schedule to ensure seasonal reindeer migration and husbandry will be maintained. This includes a commitment to avoid mining activities during periods of the year during which the reindeer movements are expected. Reindeer herding impact assessments have been completed by the indigenous peoples group representatives, and an extensive Stakeholder Engagement Plan is being implemented."
- Forums
- ASX - By Stock
- TLG
- The Permitting Process
The Permitting Process, page-9
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TLG (ASX) to my watchlist
(20min delay)
|
|||||
Last
39.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $160.0M |
Open | High | Low | Value | Volume |
40.5¢ | 40.5¢ | 39.0¢ | $114.0K | 288.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 6831 | 39.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
40.0¢ | 31404 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 4431 | 0.390 |
5 | 29558 | 0.385 |
14 | 203144 | 0.380 |
5 | 62056 | 0.375 |
7 | 264741 | 0.370 |
Price($) | Vol. | No. |
---|---|---|
0.400 | 31404 | 1 |
0.405 | 23000 | 2 |
0.410 | 12221 | 1 |
0.420 | 8500 | 1 |
0.430 | 83519 | 3 |
Last trade - 16.10pm 23/08/2024 (20 minute delay) ? |
Featured News
TLG (ASX) Chart |
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online