PSA 0.00% 2.1¢ petsec energy limited

the pig

  1. 5,249 Posts.
    lightbulb Created with Sketch. 40
    Thought this would have been price sensitive and would have been announced much sooner.


    "Petsec Energy today announced that its Main Pass 270 field has been shut in since 19
    April 2008 due to a “pig” stuck in a production pipeline owned and operated by a third
    party. A pig is an oval, football shaped object which is run through pipelines as part of
    normal maintenance to clear pipelines of paraffin and other impurities that clog the flow
    of oil and condensate.
    The production pipeline affected is used by Petsec Energy and other producers to
    transport condensate produced from various leases in this area. Without a pipeline to
    transport the condensate produced at Main Pass 270, Petsec Energy is also not able to
    flow the gas from the field. Daily production from the Main Pass 270 field net to Petsec
    Energy was approximately 4,700 MCF and 120 barrels of oil prior to the pipeline being
    blocked.
    The operator of the pipeline has been working diligently to resolve the problem and it was
    initially expected that the blockage would be removed fairly quickly thereby returning the
    pipeline to service. Currently, the operator is injecting acid into the pipeline through hot
    taps in an attempt to dissolve the stuck pig. Petsec Energy will advise when the field
    returns to production.
    Petsec owns a 25% working interest (20.83% net revenue interest) in the Main Pass 270 Field."
 
watchlist Created with Sketch. Add PSA (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.