"Extraction methods for this tricky deposit seem to have been defined in theory, with a recovery rate slightly upwards of 90%"
Meant to read upwards of 80%, not 90%.
Speaking of recovery rates, depending on how much heat we are able to extract from our super-heated geofluid, we are going to need the mother of all binary-exchange surface areas, and a cooling system that dwarfs the plant itself.
If drilling is successful, the demo plant will be the first step in designing the largest surface-heat-exchanger in the world. A technical challenge, so it is good to have Exorka and their direct experience.
- Forums
- ASX - By Stock
- RNE
- the problem with geothermal
the problem with geothermal, page-17
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
-0.001(25.0%) |
Mkt cap ! $1.146M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.1¢ | $13.03K | 8.521M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
60 | 73221269 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 5500000 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
60 | 73221269 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 5500000 | 3 |
0.003 | 8581983 | 15 |
0.004 | 1255391 | 5 |
0.005 | 1200000 | 2 |
0.006 | 3269000 | 2 |
Last trade - 14.33pm 13/09/2024 (20 minute delay) ? |
Featured News
RNE (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online