If the pilot plant is being shifted to Perth, most of the testing must have finished.
in a market where hydrogen is being mentioned in the media almost daily, you would think it would be appropriate to get the optimised results out.
And it seems like they should really have plans for the demo plant by now. At least have a location ready so they can start preparing the site for contruction... but from what I hear they can’t even decide if it’s in Perth or over east..
No good waiting until 2019 to start construction for it to be ready by 2021. Share price will drown if that’s the case, especially trying to raise funds in this downward market.
- Forums
- ASX - By Stock
- The race towards a green future is heating up
If the pilot plant is being shifted to Perth, most of the...
- There are more pages in this discussion • 184 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
46.3¢ |
Change
-0.003(0.54%) |
Mkt cap ! $107.0M |
Open | High | Low | Value | Volume |
46.5¢ | 48.0¢ | 46.0¢ | $16.84K | 36.36K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 63467 | 46.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
46.5¢ | 15 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 63467 | 0.460 |
9 | 125424 | 0.455 |
11 | 34894 | 0.450 |
8 | 117214 | 0.445 |
6 | 76015 | 0.440 |
Price($) | Vol. | No. |
---|---|---|
0.465 | 15 | 1 |
0.470 | 3000 | 1 |
0.475 | 26191 | 1 |
0.480 | 25530 | 3 |
0.485 | 45198 | 4 |
Last trade - 12.18pm 05/06/2024 (20 minute delay) ? |
|
|||||
Last
46.5¢ |
  |
Change
-0.003 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
47.0¢ | 47.5¢ | 46.0¢ | 14537 | ||
Last updated 12.18pm 05/06/2024 ? |
Featured News
HZR (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
SPONSORED BY The Market Online