Chalco, obviously I have been involved with declines a little more than you OR you didn’t read my post. I have allowed for the decline to be separate and parallel to the orebody and enter the orebody is cross cuts. I have allowed a cost for the decline ($4,000 per meter) and 2,000 tonnes and allocated costs separately for the access cross cuts. Also allowed a separate cost per tonne for the mining of the ore. Chalco, it doesn’t matter what anyone posts on HC you always say something that is wrong and negative. You seem to be in such a hurry to post something negative that you couldn’t wait to read my (peer reviewed post) to write your post. I think everyone has your measure..hope you read up in RC drill by now. Always good for laugh. Now that you have read my reply and point out your post is wrong , have you anything else to say??It doesn’t matter which say you play it, Mt Freda is an absolute plum of a GoldMine.
Add to My Watchlist
What is My Watchlist?