BPH 11.1% 1.6¢ bph energy ltd

To elaborate on the word "variation". As far as I can tell, if...

  1. 6,207 Posts.
    lightbulb Created with Sketch. 309
    To elaborate on the word "variation". As far as I can tell, if the first application gets rejected and the second application gets accepted then they are still required to do a drill and a 3D seismic survey. This is a fact. This is because the second application is not "varying" the permit to exclude a 3D seismic scan.
 
watchlist Created with Sketch. Add BPH (ASX) to my watchlist
(20min delay)
Last
1.6¢
Change
-0.002(11.1%)
Mkt cap ! $18.36M
Open High Low Value Volume
1.8¢ 1.8¢ 1.6¢ $29.14K 1.762M

Buyers (Bids)

No. Vol. Price($)
11 920969 1.6¢
 

Sellers (Offers)

Price($) Vol. No.
1.7¢ 93021 2
View Market Depth
Last trade - 16.10pm 05/08/2024 (20 minute delay) ?
BPH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.