PLS 5.69% $3.16 pilbara minerals limited

The Orphan phase is the construction phase that typically is...

  1. 46,713 Posts.
    lightbulb Created with Sketch. 8837
    The Orphan phase is the construction phase that typically is vulnerable to delays and cost overruns - its the stage where funding has been secured but no income $$ is being produced.

    http://www.miningglobal.com/operations/gifs-5-stages-mining-life-cycle
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.