AUZ 5.56% 1.0¢ australian mines limited

the wolves are just waiting for panic, page-8

  1. 18,874 Posts.
    lightbulb Created with Sketch. 93
    Ann out Chris!!
    Via Electronic Lodgement Pages: 3
    Dear Sir
    Blair Nickel Mine Production for July above Budget and Exploration
    Program
    Mine Production July
    The company is very pleased to advise that production from the Blair Mine for
    July was 14% above budget production at 153 contained Ni Tonnes.
    Production was 4010 ore tonnes at 3.81 % Ni delivered to the Kambalda
    concentrator. This continues on from the good production results announced
    in the June quarter.
    Exploration Targets
    The Company is reviewing its exploration program with a strong priority
    towards providing early results at the following targets: -
    1. Area 57 – EM Targets
    Underground diamond drilling is planned to test existing targets up-plunge and
    along strike from known ore positions. In addition, a surface survey using
    BHP Billiton’s proprietary Geoferret EM technology will be employed to test for
    depth extensions. This target is near existing mine workings and is considered
    a high priority target to extend the Area 57 ore body which is open up- and
    down-plunge.
    2. Anomaly 11 – Oxides
    RC drilling is planned to test a number of shallow responses from the recent
    fixed loop surface EM survey, and to further define the plunge potential of
    known Ni sulphide mineralisation,
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.001(5.56%)
Mkt cap ! $13.28M
Open High Low Value Volume
1.0¢ 1.0¢ 1.0¢ $1.61K 161.5K

Buyers (Bids)

No. Vol. Price($)
19 4173372 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 4407983 18
View Market Depth
Last trade - 12.15pm 19/07/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.