COE 2.27% 21.5¢ cooper energy limited

Bit of info of problems that may be encountered if we don't do...

  1. 1,619 Posts.
    lightbulb Created with Sketch. 8
    Bit of info of problems that may be encountered if we don't do the job properly. Seems part and parcel of Indonesian drilling. Thinks this is just an extract of a larger thesis.

    http://www.osti.gov/energycitations/product.biblio.jsp?osti_id=5914165

    Energy Citations Database
    This paper presents the Mobil Oil Indonesia experience associated with cementing the 9-5/8 inch casing through the abnormally pressured and water sensitive sand/shale Baong formation in the Arun field, North Sumatra. The paper will discuss how the cement slurries and cementing procedures for the 9-5/8 inch casing have been modified to overcome two major problems. The first being the inability to fully displace the cement due to swelling of sensitive shales, the second being severe annular flow after cementing. This paper will further examine the changes made to slurry design after the recent discovery that circulating temperatures during 9-5/8 inch cementing operations are considerably lower than predicted by the API schedules. Because of these low temperatures, the slurries used in the past were greatly over retarded which contributed to the long and costly afterflow periods.
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
21.5¢
Change
-0.005(2.27%)
Mkt cap ! $567.6M
Open High Low Value Volume
21.5¢ 22.0¢ 21.5¢ $272.0K 1.242M

Buyers (Bids)

No. Vol. Price($)
8 457152 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 17446 8
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.