Looking at the updated MPS report (20 Sept 2010) mining ore at 0.6%Cu + other metals will have a cash cost greater than US$2.2 per lb to me this is on the high side. At a cut off grade of 0.15%Cu eq I would expect costs to be even greater. IGV's can be deceiving.