IF you do some "ballpark" estimates on a 17 meter thick zone over a resonable strick zone (assuming 2.5 tonnes in each cubic meter of dirt containg between 1/2 to 1 pound of U per cubic meter) the numbers get extremely large. Many other explorers get 1-3 meters of paydirt, anywhere near 17 meters is completely off the clock. This stuff is literally sitting on surface so operating costs would be very low. Suspect we will see another day of very heavy trading as traders wake up to the speculative potential and that is based on relatively low sample grades. IF we get into high grades in the samples this thing will do a MOX.
WMT
western metals limited
IF you do some "ballpark" estimates on a 17 meter thick zone...
Add to My Watchlist
What is My Watchlist?