32/64 choke used for 14 day flow test.Cement Squeeze bottom of well where natural fractures are flowing water,frac upper zone above 6 if required home and hosed.Good luck!Hold tight.
Week 34 Wrap: HotCopper's top watched; Oz banks cut saver interest; Kamala’s 28% corporate tax; AI’s back
SER How flooding did Strategic Energy Resources a favour: Four holes down in 'redesigned' gold & copper campaign
CC9 Chariot locks in high-potential drill target at Black Mountain, one of the USA's largest lithium landholdings