OM#5 has been drilled to a total depth of 645m after intersecting approximately 52.2m of net coal within the target Morley coal measures across an interval of only 62.4m. Geophysical logs have confirmed the section with the thickness of the target Morley #2 seam measuring 38.2m greatly exceeding all expectations for the area.
Add to My Watchlist
What is My Watchlist?