NEO nuenco nl

this is the announcement

  1. 11,360 Posts.
    lightbulb Created with Sketch. 84
    By e-lodgement
    5 December 2007
    Manager Announcements
    Company Announcements Office
    Australian Securities Exchange
    10th Floor, 20 Bond Street
    SYDNEY NSW 2000
    Via electronic lodgement
    Southeast Lost Hills Gas Project in California (USA)
    Successful commencement of testing program
    Key points:
    • 48 hour production test of 3-13 confirms commercially viable production
    rates up to 600,000 cubic feet per day
    • Program being developed for immediate implementation to test multiple
    zones in the remaining wells.
    Australian based oil & gas exploration and development company Nuenco NL wishes to advise that
    initial testing at the Southeast Lost Hills Gas Project (SELH) in the San Joaquin Basin in California has
    been successful. Jack Hamar 3-13 flowed gas at three sustained production rates of 300,000 cubic
    feet per day (300 MCFPD), 450 MCFPD and 633 MCFPD over a 48 hour testing period. The longest
    test period was at 633 MCFPD with the tubing pressure constant at 1185 psi on a 6/64 inch choke.
    The participants in the South East lost Hills project, Nuenco 50% and Operator and 50% partner
    Livingstone Energy Inc (wholly-owned US subsidiary of Solimar Energy), are planning to recomplete
    and test the other three wells (1-12, 1-13 and 2-13) which encountered gas over numerous intervals
    in this prospect area as soon as possible. .
    The aim of testing the SELH operation is to confirm commercially viable production rates from these
    wells and to ascertain the reserves potential. The target is to prove up and exploit a substantial gas
    accumulation in the shallow Pliocene reservoirs that have been uncovered by drilling to date.
    The participants are reviewing options and timing to allow the transportation and sale of Gas from the
    commercial wells once testing has been completed. Given the ease of access to infrastructure, the
    strong gas prices and demand, the participants intend to commercialise this field as soon as possible
    South East Lost Hills Project Showing Jack Hamar Gas Wells
    ANTHONY KAIN
    Managing Director
 
watchlist Created with Sketch. Add NEO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.