Wrong, wrong , wrong wrong.
The Spanish electricity system is interconnected with the electricity system of Portugal, forming both the Iberian electricity system, and with the electricity system of France, and by this route, with the Central European electricity system.
So they have a backup called NUCLEAR via France...They are not backing themselves up with batteries.
Will they cut the cord to power from other counties when powered by renewables????
- Forums
- Science & Medicine
- This is why Climate Activists will never boycott fossil fuels. They are HYPOCRITES!
Wrong, wrong , wrong wrong. The Spanish electricity system is...
- There are more pages in this discussion • 337 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)