SLX 3.11% $4.64 silex systems limited

This PDF on Reprocessed Uranium is very Interesting, page-33

  1. 20,266 Posts.
    lightbulb Created with Sketch. 1791
    Well this one was written about five years ago now and it was considered top secret even back then, but the original contract was for between 5 and 15 years, you will notice the mention of GNF in this release so this shielding may apply to both the laser separation and also the fuel manufacturing, which would indicate that at that point they were looking to enrich the RepU to a higher degree and leave the actinides in it, that may have changed since if they can selectively remove the U235 in the laser isotope separation plant?

    http://pbadupws.nrc.gov/docs/ML1026/ML102670102.pdf

    Global Laser Enrichment Michael "Brad" Sellers
    Security Specialist
    SecuritY-Related Information Notice 3901 Castle Hayne Road.

    This letter forwards security-related sensitive information, Wilmington, NC 28402-0780
    which is to be withheld from public disclosure in accordance with 10CFR2.390 and the instructions in RIS 2005-31.
    The balance of this letter may be considered non-sensitive upon the removal of the Enclosures.
    T9108196200
    F 910 819 5731
    C 910 616 8624

    [email protected]
    Sept 10, 2010
    MlBS-10-002

    Attn: Document Control Desk
    Director, Division of Security Operations
    Office of Nuclear Security and Response
    U.S. Nuclear Regulatory Commission
    Washington, D.C. 20555-0001

    Subject: Submittal of Edge Technologies SPPP for Non-Possessing Facility
    Global Nuclear Fuel-Americas, LLC and GE-Hitachi Global Laser Enrichment LLC (GLE) hereby submit a Standard Practice Procedures Plan for another GLE vendor facility, at the Edge Technologies, 126 Royal View Ln,al Laser Enrichment

    Laser Enrichment Michael "Brad" Sellers
    Security Specialist
    SecuritY-Related Information Notice 3901 Castle Hayne Road


    [email protected]
    Sept 10, 2010
    MlBS-10-002
    Attn: Document Control Desk
    Director, Division of Security Operations
    Office of Nuclear Security and Response
    U.S. Nuclear Regulatory Commission
    Washington, D.C. 20555-0001
    Subject: Submittal of Edge Technologies SPPP for Non-Possessing Facility
    Global Nuclear Fuel-Americas, LLC and GE-Hitachi Global Laser Enrichment LLC (GLE) hereby submit a Standard Practice Procedures Plan for another GLE vendor facility, at the Edge Technologies, 126 Royal View Ln, Powell, Tn location, which will be doing business at Merrick and Company 1093 Commerce
    Park Dr., Oak Ridge Tn., to the U.S. Nuclear Regulatory Commission (NRC) and request the issuance of an NRC Non-Possessing facility security clearance for this facility.

    This request has been previously discussed with Mr. J. Keith Everly.
    To support GLE project schedules, we request that NRC reviews and approvals be accomplished to support issuance of a facility clearance for this facility by Oct 10, 2010. To support this schedule, we request any initial NRC comments or questions regarding the SPPP by Oct 2, 2010, and an NRC readiness review for the SAIC Oak Ridge facility on or before Oct 11, 2010.

    We will work With NRC staff to establish the actual review date.


    The enclosure of this transmittal contains security-related sensitive information which is to be withheld from public disclosure in accordance with 10 CFR 2.390 and the instructions in RIS 2005-31.
    Global Laser
    Last edited by moosey: 04/12/15
 
watchlist Created with Sketch. Add SLX (ASX) to my watchlist
(20min delay)
Last
$4.64
Change
0.140(3.11%)
Mkt cap ! $1.100B
Open High Low Value Volume
$4.61 $4.70 $4.53 $1.202M 259.3K

Buyers (Bids)

No. Vol. Price($)
1 2001 $4.63
 

Sellers (Offers)

Price($) Vol. No.
$4.67 961 2
View Market Depth
Last trade - 16.10pm 07/10/2024 (20 minute delay) ?
SLX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.