NAE 0.00% 0.4¢ new age exploration limited

Seems some have forgotten all of the things NAE has done in the...

  1. 8,377 Posts.
    lightbulb Created with Sketch. 1176
    Seems some have forgotten all of the things NAE has done in the last 12 Months,
    So thought I would post it on here to show holders what they HAVE done:

    • Exploration advances with a second phase of UltraFine+ Geochemical sampling on the Central Pilbara Projects, to infill and extend high priority LCT (lithium, caesium, tantalum) Pegmatite targets in the in the lead up to drilling
    • NAE is targeting LCT Pegmatites similar to other Central Pilbara spodumene-rich deposits of Wodgina, Pilgangoora and Andover
    • Greg Hudson appointed as Chief Geological Consultant (Giant Geological) conducted an immediate Helicopter Reconnaissance programme to assess the projects

    PILBARA GOLD AND LITHIUM PROJECTS Central Pilbara Projects
    • First Phase UltraFine+ 200m x 200m spaced Gold and Lithium Soil Geochemical Surveys completed over several of the Company’s Central Pilbara Project areas
    • Results from Phase 1 UltraFine+ Soil Geochemistry sampling revealed multiple extensive areas of exceptionally strong, coherent lithium anomalism
    • Five lithium anomalies with coincident elevated pathfinder elements were identified up to 8km long, 3km wide and all remain open in all directions
    Helicopter-reconnaissance program along with collection of rock chip samples has been completed
    • Detailed UltraFine+ gochemical analysis of the soils taken at the Brahman Project have identified additional high priority lithium targets for drill-testing
    • Previous drilling at the Brahman Project identified LCT pathfinder elements and ongoing analysis of those results and geophysics continues to prioritise exploration

    Meentheena Project, East Pilbara
    • Three Exploration Licence Applications and one granted Exploration Licence totalling 484 km2 . The project is located east of, and mid-way between, the established mining towns of Marble Bar and Nullagine, 250 kilometres southeast of Port Hedland
    • A significant growth opportunity supporting NAE’s focus on Precious and Battery Metals within a highly contested, well-endowed, yet under-explored part of the rapidly emerging Gold and Lithium region of the East Pilbara, WA

    NEW ZEALAND GOLD PROJECTS Marlborough Gold Project
    • NAE expands its strategic landholding in New Zealand following the granting of 499km2 Prospecting Permit PP60725 over the Company’s 100% owned Marlborough Gold Project
    • The Marlborough Permit is underexplored and highly prospective with compelling targets, including historically productive hard-rock gold mines with little to no modern exploration methods applied
    • An initial work program involving a geophysical review, mapping, rock chip and soil sampling is planned in tandem with NAE’s further exploration of its Otago permits
    • Initial reconnaissance sampling demonstrates quartz veins hosting high-grade gold are extensive and worthy exploration targets

    Manorburn Prospecting Permit
    • Gold assay results from surface sampling produced encouraging results

    Lammerlaw Gold Project
    • A review of recently acquired detailed geophysical data highlighted compelling new Gold targets on under explored locations
    • XRF elevated Arsenic results indicate a significant extension to known Gold anomalies • Contiguous tenement position allows proven targeting methodologies to be extended along the full ~25km of prospective structural corridor
    • Extension of duration granted for Lammerlaw Prospecting Permit PP60544, securing the strategic landholding

    Otago Pioneer Quartz (OPQ) Gold Exploration Project
    • Additional high-grade gold prospects identified from recent field work • Coarse visible gold found in float samples close to historic workings • Target lengths significantly extended to >6km along the highly prospective OPQ fault zone, capable of hosting significant gold deposits • Re-processed geophysics identified new targeting methodology for structures hosting high-grade gold lodes • The initial 879m OPQ RC drill program tested the previously undrilled OPQ Shear Zone in the vicinity of historic workings with four of six holes intercepting the OPQ Shear zone • OPQ drilling is the first hard-rock drilling to test the historically productive Waipori Goldfield. • Results from the OPQ Shear Zone return encouraging intercepts • Assays results help confirm the OPQ Shear Zone is a fertile gold system hosting gold bearing quartz veins and containing broad gold halo mineralisation • The OPQ Shear Zone remains open in all directions • A diamond drilling program based on the interception of the larger than anticipated broad mineralised zone and technical limitations with RC drilling is being planned

    High-Grade gold identified in rock chip samples from Lammerlaw and OPQ
    • Rock chip sampling at the historic Cox’s, Cosmopolitan, ABC and Nuggety Gully, Fulton and Bucks mines/prospects in Otago returned multiple high-grade results • Numerous rock samples assayed >1 g/t Au, with the majority of rock chip samples being mineralised above background levels • Results confirm potential for multiple high-grade gold drill targets associated with the historic mines • Lammerlaw in-fill gold assays for soil samples collected in 2021 highlight new areas of interest and highlight existing targets

    LOCHINVAR METALLURGICAL COAL PROJECT
    • A review of the 2014 Scoping Study1 as previously updated in 20172 has been completed by Palaris which confirmed that the project economics of the Lochinvar Metallurgical Coal Project remain robust, despite recent cost increases in the UK • A metallurgical Coal Resource of 111 Mt3 has previously been defined within the Lochinvar project area (49 Mt Indicated Resource and 62 Mt Inferred Resource)3
    • Ideally located to become a supplier of low cost, high volatile metallurgical coal to the European steel industry
    • The Board continues to receive numerous enquiries relating to this project

    PILBARA LITHIUM – GOLD PROJECTS
    • Analysis using cutting-edge CSIRO technology, geochemical modelling and field-checking has generated multiple high priority lithium targets for drill-testing • Targeting LCT (lithium, caesium, tantalum) Pegmatites similar to other Central Pilbara spodumene-rich deposits of Wodgina, Mt Francisco and Pilgangoora located on the periphery of the same granite units • Helicopter-reconnaissance program along with collection of rock chip samples has been completed • None of the areas have been previously explored for Lithium and none have been drill tested • Detailed Geochemical analysis of the ultrafine soils taken at the Brahman Project have identified additional high priority lithium targets for drill-testing • Previous drilling identified LCT pathfinder elements and ongoing analysis of those results and geophysics continues to prioritise exploration • Drilling operations to be initiated in the upcoming field season at all the identified high-priority targets

    Subject to completing a program of works (POW) and land access approvals, drilling and further geochemical sampling will be undertaken in the upcoming Pilbara field season.

    NEW ZEALAND GOLD PROJECTS
    • Results from the OPQ Shear Zone at the Central Otago Gold Projectreturn encouraging intercepts • The initial 879m OPQ RC drill program tested the previously undrilled OPQ Shear Zone in the vicinity of historic workings with four of six holes intercepting the OPQ Shear zone • Assays results help confirm the OPQ Shear Zone is a fertile gold system hosting gold bearing quartz veins and containing broad gold halo mineralisation • The OPQ Shear Zone remains open in all directions • A diamond drilling program based on the interception of the larger than anticipated broad mineralised zone and technical limitations with RC drilling is being planned

    • Detailed Geochemical analysis of the ultrafine soils taken at the Brahman Project have identified additional high priority lithium targets for drill-testing • NAE targeting LCT (lithium, caesium, tantalum) Pegmatites similar to other Central Pilbara spodumene-rich deposits of Wodgina, Mt Francisco and Pilgangoora • Previous drilling identified LCT pathfinder elements and ongoing analysis of those results and geophysics continues to prioritise exploration • Drilling operations to be initiated in the upcoming field season at all the identified high-priority targets

    Maiden Drill Program at OPQ Intersects Broad Gold Mineralisation
    HIGHLIGHTS
    • Results from the OPQ Shear Zone at the Central Otago Gold Project, New Zealand return encouraging intercepts • The initial 879m OPQ RC drill program tested the previously undrilled OPQ Shear Zone in the vicinity of historic workings with four of six holes intercepting the OPQ Shear zone • Assays results help confirm the OPQ Shear Zone is a fertile gold system hosting gold bearing quartz veins and containing broad gold halo mineralisation • The OPQ Shear Zone remains open in all directions • A diamond drilling program based on the interception of the larger than anticipated broad mineralised zone and technical limitations with RC drilling is being planned

    • 6m @ 1.4 g/t Au from 106m and 1m @ 1.9 g/t Au from 161m to EOH in OPQ004
    • 1m @ 2.53 g/t Au from 124m in OPQ006
    • 1m @ 0.92 g/t Au from 144m in OPQ002
    • 1m @ 0.67 g/t Au from 82m in OPQ001

    High priority Lithium targets, Central Pilbara Projects, WA
    Multiple discrete lithium targets with values up to 843ppm Li HIGHLIGHTS • Analysis using cutting-edge CSIRO technology, geochemical modelling and fieldchecking has generated multiple high priority lithium targets for drill-testing • Targeting LCT (lithium, caesium, tantalum) Pegmatites similar to other Central Pilbara spodumene-rich deposits of Wodgina, Mt Francisco and Pilgangoora located on the periphery of the same granite units • Helicopter-reconnaissance program along with collection of rock chip samples has been completed • None of the areas have been previously explored for Lithium and none have been drill tested • Targets have been prioritised for Aircore/RC drill testing planned to commence in the upcoming Pilbara field season

    New Age Exploration (ASX: NAE) (NAE or the Company) is pleased to announce it has completed geochemical analysis and targeting from the first phase of the Ultrafine geochemical soil surveys at its extensive Central Pilbara Gold-Lithium Project in Western Australia. Multiple high priority LCT (Lithium, Caesium, Tantalum) pegmatite targets have been identified for follow up drilling. The Project is centred over the highly prospective yet under-explored Mallina – Whim Creek Basin of the Pilbara Craton, Western Australia, in close proximity to the World Class Wodgina and Pilgangoora Lithium Mining Operations and the recently discovered Hemi Gold Deposit (Pilbara Minerals, ASX: PLS and De Grey Mining, ASX: DEG respectively).

    QUARTERLY ACTIVITIES REPORT – MARCH 2023
    HIGHLIGHTS
    NEW ZEALAND GOLD PROJECTS • A maiden 935m reverse circulation drill program commenced at OPQ Mine in Otago, New Zealand. Drilling targeted down plunge of the OPQ Mine and test a 750m section along strike. • OPQ drilling is the first hard-rock drilling to test the historically productive Waipori Goldfield. • Gold assay results from surface sampling at Manorburn Prospecting Permit produced encouraging results. • Initial reconnaissance sampling in the Marlborough Prospecting Permit demonstrates quartz veins hosting high-grade gold are extensive and worthy exploration targets.

    PILBARA GOLD AND LITHIUM PROJECTS
    • Awaiting final results of first phase of Ultrafine geochemical soil surveys from CSIRO’s Department of Mineral Resources as a part of NAE’s sponsorship of the CSIRO’s Ultrafine+ Next Gen Analytics Project. The results are expected to be received and evaluated in Q2 2023. • The Company commenced an immediate follow up Helicopter reconnaissance programme to assess these priority areas in more detail. • The outcomes from these activities will be assessed by a geochemical specialist and used to further refine the high priority gold and lithium targets.

    LOCHINVAR METALLURGICAL COAL PROJECT
    • Lochinvar is ideally located to become a supplier of low cost, high volatile metallurgical coal to the European steel industry. • The Board continues to receive numerous enquiries relating to this project.

    Maiden Drill Program to Commence at OPQ
    Positive Surface Sample Results from Manorburn and Marlborough
    HIGHLIGHTS
    • A maiden 935m reverse circulation drill program to commence at OPQ Mine in Otago, New Zealand. Drilling will target down plunge of the OPQ Mine and test a 750m section along strike • OPQ drilling will be the first hard-rock drilling to test the historically productive Waipori Goldfield • Gold assay results from surface sampling at Manorburn Prospecting Permit produce encouraging results • Initial reconnaissance sampling in the Marlborough Prospecting Permit demonstrates quartz veins hosting high-grade gold are extensive and worthy exploration targets

    QUARTERLY ACTIVITIES REPORT – DECEMBER 2022
    HIGHLIGHTS
    PILBARA GOLD AND LITHIUM PROJECTS • Results from Phase 1 Ultrafine Soil Geochemistry sampling revealed multiple extensive areas of exceptionally strong, coherent lithium anomalism • Five lithium anomalies with coincident elevated pathfinder elements were identified up to 8km long, 3km wide and all remain open in all directions • None of the areas have been previously explored and none have been drill tested
    NEW ZEALAND GOLD PROJECTS • High-Grade gold identified in rock chip samples from Lammerlaw and OPQ Project Areas • Rock chip sampling at the historic Cox’s, Cosmopolitan, ABC and Nuggety Gully, Fulton and Bucks mines/prospects in Otago returned multiple high-grade results, including 27.0 g/t Au, 17.0 g/t Au, 14.1 g/t Au and 12.0 g/t Au • Numerous rock samples assayed >1 g/t Au, with the majority of rock chip samples being mineralised above background levels • Results confirm potential for multiple high-grade gold drill targets associated with the historic mines • Lammerlaw in-fill gold assays for soil samples collected in 2021 highlight new areas of interest and highlight existing targets • These results continue the positive results from NAE’s exploration program across the Central Otago Project area • Maiden drilling program planned for Q1 2023
    LOCHINVAR METTALURGICAL COAL PROJECT • A review of the 2014 Scoping Study1 as previously updated in 20172 has been completed by Palaris which confirms the project economics of the Lochinvar Metallurgical Coal Project remain robust, despite recent cost increases in the UK • A metallurgical Coal Resource of 111 Mt3 has previously been defined within the Lochinvar project area (49 Mt Indicated Resource and 62 Mt Inferred Resource)3 • Ideally positioned to become a supplier of low cost, high quality metallurgical coal

    Extensive, Strong Lithium Geochemical Anomalies identified at the Central Pilbara Projects, WA
    Ultrafine soil sampling outlines multiple large lithium targets over 8km long with values up to 843ppm HIGHLIGHTS • Results from Phase 1 Ultrafine Soil Geochemistry sampling reveal multiple extensive areas of exceptionally strong, coherent lithium anomalism • Five lithium anomalies with coincident elevated pathfinder elements were identified up to 8km long, 3km wide and all remain open in all directions • None of the areas have been previously explored and none have been drill tested. • A helicopter supported reconnaissance program has been immediately initiated to assess the priority areas in more detail

    Lochinvar Metallurgical Coal Project Update
    HIGHLIGHTS • A review of the 2014 Scoping Study1 as previously updated in 20172 has been completed by Palaris which confirms the project economics of the Lochinvar Metallurgical Coal Project remain robust, despite recent cost increases in the UK • A metallurgical Coal Resource of 111 Mt3 has previously been defined within the Lochinvar project area (49 Mt Indicated Resource and 62 Mt Inferred Resource) 3 • Ideally positioned to become a supplier of low cost, high quality metallurgical coal

    High-Grade Gold Identified in Rock Chip Samples from Lammerlaw and OPQ Project Areas
    – New Zealand HIGHLIGHTS
    • Rock chip sampling at the historic Cox’s, Cosmopolitan, ABC and Nuggety Gully, Fulton and Bucks mines/prospects in Otago, New Zealand has returned multiple high-grade results, including 27.0 g/t Au, 17.0 g/t Au, 14.1 g/t Au and 12.0 g/t Au • Numerous rock samples assayed >1 g/t Au, with the majority of rock chip samples being mineralised above background levels • Results confirm potential for multiple high-grade gold drill targets associated with the historic mines • Lammerlaw in-fill gold assays for soil samples collected in 2021 highlight new areas of interest and highlight existing targets • These results continue the positive results from NAE’s exploration program across the Central Otago Project area • Maiden drilling program planned for 2022-2023 field season

    QUARTERLY ACTIVITIES REPORT – SEPTEMBER 2022 HIGHLIGHTS PILBARA GOLD AND LITHIUM PROJECTS • NAE commits to be a key sponsor of CSIRO’s Ultrafine Next Gen Geochemical Analytics Program ensuring access to industry leading, cutting edge soil geochemical sampling, analytical and data interpretation technology • First Phase Ultra-fine 200m x 200m spaced Gold and Lithium Soil Geochemical Surveys completed over several of the Company’s Central Pilbara Project areas • Sampling focused on high priority “Hemi Style” intrusive related and structural gold targets and on gold and lithium target areas defined from recent drilling campaigns • A total of 5,300 samples have been collected and delivered for analysis • Results are expected to be received and reported during Q4 2022 Meentheena Project, East Pilbara • Four New Exploration Licence Applications totalling 484 km2 located east of, and mid-way between, the established mining towns of Marble Bar and Nullagine, 250 kilometres southeast of Port Hedland • A significant growth opportunity supporting NAE’s focus on Precious and Battery Metals within a highly contested, well-endowed, yet under-explored part of the rapidly emerging Gold and Lithium region of the East Pilbara,

    WA NEW ZEALAND GOLD PROJECTS Marlborough Gold Project • NAE expands its strategic landholding in New Zealand following the granting of 499km2 Prospecting Permit PP60725 over the Company’s 100% owned Marlborough Gold Project. • The Marlborough Permit is underexplored and highly prospective with compelling targets, including historically productive hard-rock gold mines with little to no modern exploration methods applied. • An initial work program involving a geophysical review, mapping, rock chip and soil sampling is scheduled for Q3 2022 in tandem with NAE’s further exploration of its Otago permits. Otago Pioneer Quartz (OPQ) Gold Exploration Project • Additional high-grade gold prospects identified from recent field work • Coarse visible gold found in float samples close to historic workings
    • Target lengths significantly extended to >6km along the highly prospective OPQ fault zone, capable of hosting significant gold deposits • Re-processed geophysics identified new targeting methodology for structures hosting high-grade gold lodes • Several prospects within the OPQ Gold Project area now have high priority drill ready previously untested targets • Assays pending from recently collected samples

    Lammerlaw Gold Project • A review of recently acquired detailed geophysical data has highlighted compelling new Gold targets on under explored locations • XRF elevated Arsenic results indicate a significant extension to known Gold anomalies • Gold assays for auger, float and rock chip samples collected in May 2022 are currently being processed • Contiguous tenement position at Lammerlaw allows proven targeting methodologies to be extended along the full ~25km of prospective structural corridor • Extension of Duration granted for Lammerlaw Prospecting Permit PP60544, securing the strategic landholding

    LOCHINVAR METTALURICAL COAL PROJECT • Economic outlook for Lochinvar continues to improve as geopolitical events increase global demand for metallurgical coal • Ideally located to become a supplier of low cost, high volatile metallurgical coal to European markets • Independent technical consultants, Palaris Australia, engaged to provide a further update to its initial Scoping Study • Total estimated metallurgical coal resource of 111Mt1 has been defined within the Lochinvar project area comprising: 49 Mt Indicated Resource; 62 Mt Inferred Resource • Financial model to be updated to include current coal price forecasts

    NAE Expands its Pilbara Gold and Lithium Holdings with Meentheena Project, East Pilbara, WA HIGHLIGHTS • Four New Exploration Licence Applications totalling 484 km2 located east of, and mid-way between, the established mining towns of Marble Bar and Nullagine, 250 kilometres southeast of Port Hedland • A significant growth opportunity supporting NAE’s focus on Precious and Battery Metals within a highly contested, well-endowed, yet under-explored part of the rapidly emerging Gold and Lithium region of the East Pilbara, WA • A firmly established multi-commodity setting prospective for Gold and Lithium; base metals (including the battery metals, nickel, copper, and manganese); fluorite and rare metals which compliments NAE’s existing Central Pilbara Gold and Lithium Projects

    NAE Joins CSIRO’s Ultrafine Next Gen Analytics Program and Completes First Phase Gold-Lithium Geochemical Soil Surveys over its Central Pilbara Projects, WA
    HIGHLIGHTS • NAE commits to be a key sponsor of CSIRO’s Ultrafine Next Gen Geochemical Analytics Program ensuring access to industry leading, cutting edge soil geochemical sampling, analytical and data interpretation technology • First Phase Ultra-fine 200m x 200m spaced Gold and Lithium Soil Geochemical Surveys completed over several of the Company’s Central Pilbara Project areas • Sampling focused on high priority “Hemi Style” intrusive related and structural gold targets and on gold and lithium target areas defined from recent drilling campaigns • A total of 5,300 samples have been collected and delivered for analysis • Results are expected to be received and reported during Q4 2022

    .............................................................................................................................................................................

    As can clearly be seen NAE has done a lot this Year....
 
watchlist Created with Sketch. Add NAE (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $7.175M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $2.9K 725K

Buyers (Bids)

No. Vol. Price($)
33 18065434 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 6645000 4
View Market Depth
Last trade - 10.29am 04/10/2024 (20 minute delay) ?
NAE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.