Also,
"Expediting critical path works including foundations, TNB substation, steel erection, fibre reinforced plastic tank installation, underground services, off plot installations, and carbon steel tank erection..."
Why would carbon steel be used for tanks but not for the pipes???
Does not make sense.
This is a worry.
"The inspection of critical equipment from China is completed and the progress of the factory acceptance test for the process control system stands at 75%, and is scheduled for completion in the next quarter."
Critical equipment from China. Hmm...
- Forums
- ASX - By Stock
- LYC
- three mining stocks ready to take off
three mining stocks ready to take off, page-56
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
|
|||||
Last
$6.35 |
Change
-0.050(0.78%) |
Mkt cap ! $5.935B |
Open | High | Low | Value | Volume |
$6.46 | $6.47 | $6.34 | $19.83M | 3.109M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 11865 | $6.35 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.36 | 3637 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 395 | 6.660 |
1 | 13 | 6.490 |
2 | 514 | 6.460 |
1 | 120 | 6.360 |
1 | 45 | 6.350 |
Price($) | Vol. | No. |
---|---|---|
6.130 | 63 | 2 |
6.150 | 1000 | 1 |
6.190 | 1635 | 1 |
6.250 | 2319 | 3 |
6.310 | 2250 | 1 |
Last trade - 16.10pm 15/07/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online