AEV 0.00% 0.5¢ avenira limited

The rain fall at the mine site is approx 1/3 of the rain fall at...

  1. 3,048 Posts.
    The rain fall at the mine site is approx 1/3 of the rain fall at Jabiluka. Much less need for pumps and problems. The biggest dramas at the mine site is the problems with the sandy soil. They will need to get decent road works into the mine site to compact the road base down. Mind you, crappy sandy soil is easier to move with Meerkat's pick up.


 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $11.74M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
11 5394896 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 150000 1
View Market Depth
Last trade - 16.12pm 05/07/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.