This is my layman's interpretation. Would be interested to hear thoughts from people that know what they're talking about (rather than just up/down rampers).
Thunder has a massive ore reserve, nut my understanding is there are other factors that affect value during production.
Column 1 Column 2 Column 3 0 Thunderbird Coburn 1 Insitu tonnage High! Low 2 Insitu Grade High! Low 3 HM assemblage Low High 4 WHM Composition Low High 5 Strip Ratio High 0.8 Good 0.5 6 Slimes Content High 15.7 Low 2.7 7 Approvals Most All 8 Capex High Low 9 Opex??? ? ? 10 Other Details??? ? ? 11 Overall Value??? ? ?
Thanks
Add to My Watchlist
What is My Watchlist?