It is envisaged that ore from Judeira and other deposits within the Kipoi Project area, and within the nearby Lupoto Project, will also be processed during the Stage 2 operations, providing additional returns and increasing the mineral resources available as feedstock to the Stage 2 SXEW plant. Increased resources will potentially increase the nine-year mine life demonstrated in the DFS and/or annual plant throughput.
will be gobbled up by a neighbour in due course - Cathay will drop DML and come and get us potentially - much better value here. despite the DRC issues, tiger has produced above nameplate copper in 2012 (37kt) at Costs around 80c - best value producer going around.
good luck everyone.
TGS Price at posting:
34.0¢ Sentiment: Buy Disclosure: Held