ITC impress energy limited

Here is some stuff on Tigercat.The pool was targeting a mean...

  1. 5,929 Posts.
    lightbulb Created with Sketch. 118
    Here is some stuff on Tigercat.

    The pool was targeting a mean 700k bo recoverable .

    Tigercat-1 encountered a similar reservoir section to Growler-4 but the OWC is
    deeper than that for the Growler Field implying it is a separate pool
    ? The well should flow about 200 BOPD when tested

    Victoria Petroleum N.L. as operator for the PEL 104 Joint Venture advises that The Short Term Production Test (STPT) carried out over the weekend at Tigercat-1 has resulted in a measured swabbed flow of oil into the well bore at a rate of 150 barrels of oil per day from the Birkhead Formation. This was September 2009.

    That was no pump etc.


    Snippets taken from VPE and ITC reports.

    We also have a plugged gas well at Hornet. has never been put into production . Discovered moons ago.

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.