They don’t need permanent power on first.
I work with these Authorities for a living. Organising power to massive new projects in Queensland.
2yrs is normal from the time that the application is made, to getting an authority PM assigned to the project, getting the authority to complete the design, then to competing the works.
Genrrators or most recently container battery packs are used for construction power.
- Forums
- ASX - By Stock
- Time for a new CEO?
They don’t need permanent power on first.I work with these...
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNU (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $279.5M |
Open | High | Low | Value | Volume |
11.5¢ | 11.5¢ | 11.0¢ | $30.53K | 266.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
56 | 1790128 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 576739 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
57 | 1798328 | 0.110 |
33 | 1581574 | 0.105 |
69 | 4254720 | 0.100 |
7 | 200809 | 0.099 |
5 | 83200 | 0.098 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 476631 | 10 |
0.120 | 2294247 | 22 |
0.125 | 1865978 | 16 |
0.130 | 1648504 | 21 |
0.135 | 1276847 | 13 |
Last trade - 11.23am 28/05/2024 (20 minute delay) ? |
|
|||||
Last
11.0¢ |
  |
Change
0.000 ( 1.17 %) |
|||
Open | High | Low | Volume | ||
11.3¢ | 11.5¢ | 11.0¢ | 195242 | ||
Last updated 11.43am 28/05/2024 ? |
Featured News
RNU (ASX) Chart |