MMR 0.00% 0.4¢ mec resources limited

Time frame

  1. 642 Posts.
    With regards both mmr and buy my bigger concern is the time frame till real drilling is to happen at PE11.
    With a 2D to start soon I still think that it will not be ready for a drilling come this summer.
    So this would leave it to be still nearly 2 years till any thing happens.
    Any suggestions regarding a better time
    frame .
    The whitelight
 
watchlist Created with Sketch. Add MMR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.