The first field drilled was a 250bcf target, which was P&A.
The 2nd structure targeted at Kiliwani North was a seperate 10-5bcf gas target and a small oil target - presumably based on seismic results.
However they state that results have 'exceeded expectations'.
I don't know enough about gas exploration to determine the significance of the 60m column and the evidence of gas in the tertiary sandstones.
- Forums
- ASX - By Stock
- time to buy
The first field drilled was a 250bcf target, which was P&A.The...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable