Hi everyone,
Still some interesting activity going on with our shareprice at the moment. I have the impression that something bigger is happening in the background with the occassional pump then dump accumulation going on over the last week or so.
I thought that it would be interesting for us to focus on the 2 drills that are scheduled to start mid September.
Expected production of these two wells from previous drills in this area is 200 BOE/day for vertical wells and 1,000 BOE/day for horizontal wells.
Here is the drilling schedule for the next 10 wells that they had in their capital raising presentation:
![]()