    ann on 7 May said

    "The L44H-D2 deviated appraisal well is currently logging after reaching a total depth of 2,357 metres measured depth ("MD"), 2,103 metres true vertical depth ("TVD"). This is the deepest well drilled on the Na Sanun East Oil Field.
    In addition to the main volcanic zone, five deeper, never before tested volcanic intervals have been encountered at 1,079, 1,154, 1,483, 1,698 and 1,824 metres MD with measured thicknesses of 21, 6, 27, 62 and 26 metres respectively. Oil shows were observed while drilling at depths of 1,080-1,100m, 1,505-1,510m and 1,845-1,850m. Upon the completion of logging, it is anticipated testing will be conducted on up to four zones and take approximately 21 days to completion, at which time full results will be announced. Unlike POE-9A, which is in the southern fault compartment of NSE and was drilled to only one deeper volcanic horizon, L44H-D2 is in the central fault compartment of NSE and is planned to test multiple deeper volcanic zones."

    So 21 days makes it due 28 May (2 days), unless logging takes more than a day? But i also note the last few have been a few days late (maybe this one will be early :).

    And jeebus this well sounds promissing!!
 