I understand your post Raks.
But I hope they are not drilling at 3' per hour.
That will take 31 days to reach TD of 15,133' at that rate.
Then we have possibly 2 more casing runs, logging, prepping, Testing, etc etc.....??
Either way, not hard to make the changes.
The key thing I was looking at was the time zone differences.
Just noticed from the Quarterly, They have A. Gulch detailed at 13,220'. If this is correct, we may be looking at a double zone report, next report.(Lower Barker and A.Gulch). We are at 12,956' atm....and by now, hopefully drilling ahead :)
I understand your post Raks.But I hope they are not drilling at...
Add to My Watchlist
What is My Watchlist?