I'm thinking para 1 will be a producer as they've applied for the pipeline hook up. But only from the Ismay as the rest of the hole would cost to much to redrill after it was stuffed up. Hopefully para 2 will be set up to produce from lower levels if succesful...
- Forums
- ASX - By Stock
- GDN
- timeline to 9000 feet
timeline to 9000 feet, page-15
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)