EXPLORATION
Exploration priorities sit behind project development
In Sweden and Australia minimal fieldwork was undertaken during the period to conserve capital
however environmental surveys for full scale exploitation permitting of the Vittangi graphite project
continued. As part of the permitting process the Nunasvaara resource data is being reviewed for
updating to JORC 2012 standard from the current JORC 2004 status (see Fig 7 and Appendix 1). The
review will also include results of Talga’s previous exploratory drilling along strike for potential to
extend/increase the resource.
Talga has and will continue to conduct trial mining campaigns in Sweden to feed its pilot test-work
needs in Germany, in parallel with permitting activities for full scale development in future. Talga
extracted a portion of 5,000 permitted tonnes in 2015 and can extract the balance of graphite tonnes
each year up to 30 September 2018. With enough material already mined to operate through 2016
there is an opportunity to extend the next trial mining campaign to a 2017 program and this will be
reviewed.
31 July 2017
Expansion to Phase 3
Following Talga’s 2016 trial mining program the Vittangi project site has been largely rehabilitated.
Talga now has sufficient ore to complete the necessary process testing and plant scale up exercises
in Germany and potentially beyond to operations in Sweden.
Environmental consultants were engaged during the period to assist the Company in its preparation of
hydrological modelling and waste stockpile management plans for future full scale mining operations.
The applications for the exploitation licence require an environmental impact assessment to be
launched in addition to a pre-feasibility study.
Talga intends using the trial mine site as a rehabilitation ‘test bed’ to introduce best practice for mine
closure planning and testing the regrowth of plant types that support reindeer herding. The local
indigenous Sami group are engaged in the preparation of a Reindeer Impact Assessment Report that
will accompany the exploitation application.
August 2017
Following the 2016 trial mining campaign, the project site has been fully rehabilitated.
The next steps involve preparation for commercial scale production, and TLG has engaged
Environmental Consultants to begin hydrological modelling and stockpile management
planning. Baseline environmental studies are underway as a requirement to obtaining
an Exploitation Permit which will allow full scale mining. We note that TLG currently has
ample stockpiles available for Phase 3, and that if additional material is required before an
Exploitation Permit is granted, TLG can apply for another trial mining licence which should
allow for a further ore to be extracted.
https://www.talgagroup.com/irm/PDF/be5b84b9-71e1-4136-b4b8-411ae07118e2/ResearchReportonTalga
- Forums
- ASX - By Stock
- TLG
- Timeline
TLG
talga group ltd
Add to My Watchlist
10.0%
!
44.0¢

Timeline, page-5
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
44.0¢ |
Change
0.040(10.0%) |
Mkt cap ! $200.1M |
Open | High | Low | Value | Volume |
45.0¢ | 46.0¢ | 43.0¢ | $983.4K | 2.208M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 7793 | 44.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
44.5¢ | 49989 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 7793 | 0.440 |
9 | 98271 | 0.435 |
13 | 162219 | 0.430 |
5 | 60521 | 0.425 |
2 | 48822 | 0.420 |
Price($) | Vol. | No. |
---|---|---|
0.445 | 49989 | 1 |
0.450 | 11363 | 1 |
0.455 | 4687 | 1 |
0.465 | 38700 | 4 |
0.470 | 31219 | 4 |
Last trade - 16.10pm 18/07/2025 (20 minute delay) ? |
Featured News
TLG (ASX) Chart |