    EXPLORATION
    Exploration priorities sit behind project development

    In Sweden and Australia minimal fieldwork was undertaken during the period to conserve capital
    however environmental surveys for full scale exploitation permitting of the Vittangi graphite project
    continued. As part of the permitting process the Nunasvaara resource data is being reviewed for
    updating to JORC 2012 standard from the current JORC 2004 status (see Fig 7 and Appendix 1). The
    review will also include results of Talga’s previous exploratory drilling along strike for potential to
    extend/increase the resource.
    Talga has and will continue to conduct trial mining campaigns in Sweden to feed its pilot test-work
    needs in Germany, in parallel with permitting activities for full scale development in future. Talga
    extracted a portion of 5,000 permitted tonnes in 2015 and can extract the balance of graphite tonnes
    each year up to 30 September 2018. With enough material already mined to operate through 2016
    there is an opportunity to extend the next trial mining campaign to a 2017 program and this will be
    reviewed.

    31 July 2017
    Expansion to Phase 3
    Following Talga’s 2016 trial mining program the Vittangi project site has been largely rehabilitated.
    Talga now has sufficient ore to complete the necessary process testing and plant scale up exercises
    in Germany and potentially beyond to operations in Sweden.
    Environmental consultants were engaged during the period to assist the Company in its preparation of
    hydrological modelling and waste stockpile management plans for future full scale mining operations.

    The applications for the exploitation licence require an environmental impact assessment to be
    launched in addition to a pre-feasibility study.
    Talga intends using the trial mine site as a rehabilitation ‘test bed’ to introduce best practice for mine
    closure planning and testing the regrowth of plant types that support reindeer herding. The local
    indigenous Sami group are engaged in the preparation of a Reindeer Impact Assessment Report that
    will accompany the exploitation application.

    August 2017
    Following the 2016 trial mining campaign, the project site has been fully rehabilitated.
    The next steps involve preparation for commercial scale production, and TLG has engaged
    Environmental Consultants to begin hydrological modelling and stockpile management
    planning. Baseline environmental studies are underway as a requirement to obtaining
    an Exploitation Permit which will allow full scale mining. We note that TLG currently has
    ample stockpiles available for Phase 3, and that if additional material is required before an
    Exploitation Permit is granted, TLG can apply for another trial mining licence which should
    allow for a further ore to be extracted.

    https://www.talgagroup.com/irm/PDF/be5b84b9-71e1-4136-b4b8-411ae07118e2/ResearchReportonTalga

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
44.0¢
Change
0.040(10.0%)
Mkt cap ! $200.1M
Open High Low Value Volume
45.0¢ 46.0¢ 43.0¢ $983.4K 2.208M

Buyers (Bids)

No. Vol. Price($)
1 7793 44.0¢
 

Sellers (Offers)

Price($) Vol. No.
44.5¢ 49989 1
View Market Depth
Last trade - 16.10pm 18/07/2025 (20 minute delay) ?
TLG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.