JPR jupiter energy limited

timely reminder from the half yearly report

  1. 14,880 Posts.
    lightbulb Created with Sketch. 479
    "The J-50 well will use completion and perforating methods that minimise formation damage and therefore reservoir production should improve on benchmark rates from the region. The traditional completion methodologies used in the Mangistau region that have been applied to most, if not all, wells drilled in the area to date are, in the opinion of the Company, cost effective but not necessarily efficient in terms of maximising flow rates over the long term life of the well. The maximum flow rate of J-50 will be determined during the production test phase however the Company is confident that J-50 should perform, at a minimum, at the rates of other old wells that are located on the adjoining oilfield and also producing from the Triassic."
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.0¢
Change
0.000(0.00%)
Mkt cap ! $38.42M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 300000 1.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 50000 1
View Market Depth
Last trade - 16.21pm 16/09/2025 (20 minute delay) ?
JPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.