At 6 am October 22, Kyrgyz time, the rig was drilling ahead at 782m on the way to the first Cretaceous
gas target (Bed XIII), expected around 840m.
Must be getting ann soon RE: first target
At 6 am October 22, Kyrgyz time, the rig was drilling ahead at...
Add to My Watchlist
What is My Watchlist?