8 1/2” hole drilled through the Nido Formation reservoir to a total depth of 1,875 mRT at 1:00am Friday 17 October 2008.
Top reservoir to TD is 240m.
While drilling the reservoir elevated mud log gas readings (C1 to C5) were recorded, combined with strong oil fluorescence in the cuttings recovered to surface.
No “Logging While Drilling” data was acquired through the reservoir section.
The forward plan is for the Operator to acquire and interpret wireline logs to evaluate any hydrocarbon accumulation within the Tindalo structure.
Take the rest of the day off.
Regards,
opt
- Forums
- ASX - By Stock
- tindalo 1 good news no surprises
8 1/2” hole drilled through the Nido Formation reservoir to a...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist
(20min delay)
|
|||||
Last
83.0¢ |
Change
-0.015(1.78%) |
Mkt cap ! $189.2M |
Open | High | Low | Value | Volume |
85.0¢ | 85.0¢ | 83.0¢ | $9.776K | 11.53K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 14443 | 83.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
90.0¢ | 15000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 14443 | 0.830 |
1 | 12195 | 0.820 |
2 | 8450 | 0.800 |
1 | 5000 | 0.780 |
1 | 663 | 0.755 |
Price($) | Vol. | No. |
---|---|---|
0.900 | 15000 | 1 |
0.950 | 6000 | 1 |
0.970 | 10000 | 1 |
0.990 | 5000 | 1 |
1.090 | 50000 | 1 |
Last trade - 15.59pm 18/10/2024 (20 minute delay) ? |
Featured News
NDO (ASX) Chart |