NDO 0.00% 92.0¢ nido education limited

tindalo wireline logs, page-4

  1. 502 Posts.
    logs can take a few days, depends on the suite.

    they would have stabilised the hole prior to logging. unless they have lost a tool down hole, then they go fishing.... equals delays. with unstable hole conditions this may be more likely.... sounds like difficult hole conditions.
 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.