NDO nido education limited

tindalo, page-9

  1. 572 Posts.
    Sandy i totally agree, all this potential and a bunch of clowns running a circus.


    P1000 and 62strat,

    maybe either can answer.

    Tindalo -1 dry oil for 5 days then water.

    confirmed oil col 130m plus. Traget confirmed and dry.

    ST-1 pump dry oil until they acidised it and had packer failure.

    ST-1 workover, currently being evaluated. awaiting.

    Six months of time wasting.

    What i would like to know is:

    would it have been better to P&A the well, and re-positioned the AD if neccessary to drill a new well.

    62strat has mentioned this is the most expensive option, but with oil col confirmed, extra data obtained,
    would it have been better to plug and abandon T-1 and drilled a T-2 well in a better location.

    Because, they did go back and they did re-drilled T-1 exploration well, They re-entered it. They re-entered the same problem with lost circulation issues they encountered b4.
    I assume they did this to save money. am i correct. because while it may have seemed like a great spot, the aquifer, somewhat changed that.

    Would it have been better to re-drill a well at TINDALO, and gotten it right a lot easier than messing around like they have done.???????

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
67.0¢
Change
0.015(2.29%)
Mkt cap ! $152.4M
Open High Low Value Volume
67.0¢ 67.0¢ 66.0¢ $39.28K 58.63K

Buyers (Bids)

No. Vol. Price($)
1 4000 66.0¢
 

Sellers (Offers)

Price($) Vol. No.
68.5¢ 27118 2
View Market Depth
Last trade - 15.32pm 11/07/2025 (20 minute delay) ?
NDO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.