Share
4,184 Posts.
lightbulb Created with Sketch. 812
clock Created with Sketch.
09/10/22
16:49
Share
Originally posted by nextime2:
↑
Hi Bungalow, You are incorrect my understanding is its circa 170 km to Marvel Loch (one way). Industry rates are approx 10c per tonne km which is quoted as a 1 way journey. The rate is significantly cheaper in the Pilbara and can be as low as 7c. So the rate to Marvel Loch will be < $20 / tonne. RMS haul from their Vivien mine near Leister to Mount Magnet which is approx 280 km (one way) RMS haul from Marda to Edna may which is approx 170 km Bullseye Mining were hauling from near Laverton to Wiluna which was > 250 km Cufe haul from Wiluna to Geraldton which is > 700 km There are plenty more examples
Expand
So how long that ore been sitting there 3 months , why can't they arrange toll processing , if transport is that cheap