SDV 2.97% 49.0¢ scidev ltd

re: no trade Lash ,the ann says, will be treated at the hellyer...

  1. 5,344 Posts.
    lightbulb Created with Sketch. 957
    re: no trade Lash ,the ann says, will be treated at the hellyer metals project, and the scope of that is Tailings dam , demo plant,hellyer mill.One would have to assume it will be the mill as the demo plant is at full capacity at 4 t a day. EAF dust and tailings can be blended ,this mill would be operational, until the results of BFS is known if its a goer, the new mill and new tailings dam would go ahead,prep work is already been going on in these areas .
 
watchlist Created with Sketch. Add SDV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.