Yes they've been systematically working the grid left to right and from sat imagery from 10th May are about a third down line 4 . Almost 75% through the programme by now I guess. Spacing between holes is about 400m. (I'm more used to following Diamond drilling so I'm basing this on the assumption the ground in the grid was cleared for rapid aircore drilling without the need to prep heavy duty drill pads and the marks we see are actual holes and not just pads going down. Anyone with aircore experience please tell us the process?)
Look forward to results.
- Forums
- ASX - By Stock
- Tlou aircore 8/5/2023
Yes they've been systematically working the grid left to right...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CBE (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.9¢ |
Change
0.001(1.47%) |
Mkt cap ! $25.40M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.5¢ | $20.27K | 297.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 150000 | 6.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.0¢ | 351114 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 150000 | 0.064 |
1 | 169118 | 0.063 |
1 | 16129 | 0.062 |
1 | 50000 | 0.061 |
4 | 358809 | 0.060 |
Price($) | Vol. | No. |
---|---|---|
0.070 | 351114 | 3 |
0.071 | 59000 | 2 |
0.072 | 26257 | 2 |
0.073 | 35730 | 1 |
0.074 | 54215 | 1 |
Last trade - 14.39pm 17/09/2024 (20 minute delay) ? |
Featured News
CBE (ASX) Chart |