I know there is more planning drilling at Yarra to increase resource. Have these started yet, and will the DFS need to incorporate the results of said drilling.?
Not suggesting it will hold up the DFS, i'm sure their DFS timeline has factored in everything that needs to go into it.
Just wondering..