re: atomep Sushi I came across it on rigzone a while back. The inspection was due to be done in March so hopefully it is actually out of the way.
The rig is at Mobile so it does not have to big a journey to MP.
If we can go on the timeframes at WC and V then drilling each hole should be around a week each.
Production timing is hard to know. Vermilion was about 6 months after drilling from memory but Petsec already have the platform in advance so I would like to think Q3. Any earlier will be a bonus.